Greensboro Logistics Hub Inlet & Pipe Rehabilitation

Challenge

A large logistics park off I-840 experienced recurring sinkholes, ponding, and structural deterioration around its primary truck court. CCTV inspections identified multiple collapsed CMP laterals and undermined inlets causing load-bearing failure.

Solution

  • Coordinated utility locates and after-hours traffic control
  • Hydrovac daylighting around fiber and gas crossings
  • Removed 280 linear feet of failed CMP and installed reinforced concrete pipe with new junction boxes
  • Rebuilt seven inlets with polymer concrete collars and cast-iron frames/grates
  • Installed riprap energy dissipation and erosion control matting at the downstream outfall
  • Performed asphalt base repairs and 700 square yards of mill/overlay with new striping

Results

  • Eliminated sinkholes and restored full capacity ahead of peak shipping season
  • Achieved positive drainage and eliminated standing water within 48 hours after storms
  • Delivered photo-documented closeout and maintenance plan accepted by the City of Greensboro’s Stormwater Division

Services Provided: Drainage Infrastructure & Pipe Rehabilitation, Excavation & Hydrovac Support, Paving & Concrete Restoration

Request a Quote

Tell us about your Triad property. We’ll review, coordinate a site walk, and send pricing fast.